Move to the text

NEWS

TOPICS What's New

I introduced "flow analysis" (CAE analysis).
2014-08-01
I perform flow analysis (CAE analysis) before die production and will grasp the problems of the shape early in future
 
By reflecting it to a die design based on the suggestion of the most suitable shape and the data which I analyzed
 
I aim at the reduction (lead time shortening) of the die correction number of times.
 
https://matsudadenki.co.jp/en/files/libs/555/201807061707074896.jpg
https://matsudadenki.co.jp/files/libs/183/201807061214508444.jpg
https://matsudadenki.co.jp/en/files/libs/556/201807061707176392.jpg
https://matsudadenki.co.jp/files/libs/183/201807061214508444.jpg
https://matsudadenki.co.jp/en/files/libs/557/201807061707184318.jpg
https://matsudadenki.co.jp/files/libs/183/201807061214508444.jpg
https://matsudadenki.co.jp/en/files/libs/558/201807061707516368.jpg
 
Matsuda Electric industry place
〒486-0901
Ushiyamacho, Kasugai-shi, Aichi character offing relation 3030
TEL.0568-90-8808
FAX.0568-90-8813

Various switch production

Die production

Line facilities design and fabrication


Back to TOP